Titanium Alloy Gr 2 Buttweld Fittings Now Available.
Titanium alloy Gr 2 butt welding pipe fittings are made of high-quality titanium alloy Gr 2 material, and are processed through precision machining and butt welding. This material has excellent strength, corrosion resistance and low density, making it ideal for many industrial applications.
Titanium Alloy Gr 2 Buttwled Fittings Chemical Composition
| Grade | Ti | C | Fe | H | N | o |
| Ti Grade2 | 99.2min | 0.1max | 0.3max | 0.015max | 0.03max | 0.25max |
Mechanical Properties of Titanium Alloy Gr 2 Buttwled Fittings
| Element | Density | Melting Point | Tensile Strength | Elongation | Yield Strength (0.2%Offset) |
| Titanium Gr. 2 | 4.5 g/cm3 | 1665 °C (3030 °F) | Psi – 49900 , MPa – 344 | 20 % | Psi – 39900 , MPa – 275 |
Perfect Combination of Strength and Lightweight: Titanium Alloy Gr 2 Butt Welding Fittings have exceptional strength while being relatively light, providing excellent performance for industrial piping systems.
Excellent Corrosion Resistance: Titanium alloy Gr 2 butt welding pipe fittings are able to operate in harsh environments for a long time without being affected by corrosion and oxidation, providing long-lasting reliability.
Grade 2 Titanium Buttweld Fitting Purchase Checks
Grade 2 is a commercially pure titanium grade used for corrosion-resistant piping components where moderate strength and fabricability are required. Buttweld fittings may include elbows, tees, reducers and caps, but the grade name alone does not define a compliant fitting.
State the fitting type, dimensional standard, nominal pipe size, schedule or wall thickness, end preparation, grade, manufacturing route, heat treatment if applicable, surface, quantity and required documents. The fitting dimensions and wall transition must match the adjoining pipe and the governing piping specification.
For chemical, seawater or heat-transfer service, confirm process chemistry, temperature, pressure class, weld procedure and inspection requirements. Material certification and traceability should be agreed before production. Final suitability remains subject to piping design, code requirements and responsible engineering approval.

