Stacked titanium plate and sheet with clean mill-finished surfaces

Titanium technical resource | standards & applications

Titanium Plate Ultrasonic Test Reports: Coverage and Acceptance

Review titanium plate UT reports by piece identity, scan coverage, reference setup and acceptance criteria.

  • Standards-aware sourcing guidance
  • Grade and application comparisons
  • Inspection and RFQ considerations

A titanium plate ultrasonic testing report is useful only when it identifies the inspected material, examination scope and acceptance basis. Before accepting a statement such as “UT passed,” match the report to the order and confirm what was examined, how the setup was referenced, and which criteria governed the result.

Match the report to the plate and purchase order

Start with the plate or cut-blank identity. A heat number connects material to a melt, but an order may contain several plates or pieces from that heat. Ask for the piece identifier and dimensions needed to connect the UT record to the delivered item. Keep the plate marking, packing list, material certificate and examination report together.

Report itemBuyer checkClarification to request if missing
Material identityGrade, heat number, plate or piece ID, dimensions and conditionWhich delivered plate or cut blank does this record cover?
Examination basisMethod specification, revision, procedure reference and ordered acceptance class or criteriaWhich order requirement defines an acceptable result?
CoverageScanning faces, directions, examined extent and any limitations or excluded zonesDoes the stated coverage apply to the supplied geometry and stage of manufacture?
Setup referenceApplicable reference block, reflector or reference response, and procedure-defined sensitivity checksHow was the examination sensitivity established for this material and thickness?
Results and dispositionRecorded indications, their locations where required, evaluation and authorized conclusionHow do the recorded results support the stated disposition?

For the wider material order, use the ASTM B265 plate and sheet purchasing guide. The material specification and the UT examination requirement serve different purposes; neither should be replaced by an unspecified certificate label.

Define coverage before treating a scan as complete

Ask what “100%” refers to in the quotation or report: the specified scanning area, an examination of the agreed volume, or another procedure-defined scope. Have the inspection provider identify scanning surfaces and directions, the supplied plate geometry, and how the procedure addresses edges, near-surface regions or areas that cannot be examined with the selected setup.

Coverage and detection capability are separate questions. A scan path over an area does not, by itself, establish the response to every possible discontinuity at every depth and orientation. Transducer selection, material response and the examination procedure matter. Request a clear description of limitations rather than assuming that a single coverage percentage means the plate is free of every defect.

Keep the inspection stage visible

If a parent plate is examined before cutting, preserve the piece-to-parent identification and the relationship between the examined area and the supplied blanks. Record whether the report describes the parent plate or the finished delivery dimensions. Where cutting, machining or another later operation changes the inspection requirement, agree the necessary follow-up with the responsible engineering or quality authority.

Acceptance boundary: do not create a universal edge allowance, near-surface exclusion or minimum detectable flaw size from a general guide. The applicable procedure, ordered criteria and demonstrated examination capability must resolve those details.

Separate equipment certification from the examination setup

“Calibrated equipment” can describe different checks. Evident distinguishes velocity/zero calibration, reference calibration and periodic instrument calibration certification. These address different aspects of a measurement or examination; an instrument certificate alone does not describe the reference response used for a particular plate inspection.

Request the setup information relevant to the ordered procedure, including the reference standard or block identification and the required checks of sensitivity. Ask the inspection provider to explain suitability for the plate material, condition and thickness range. Keep this review with the UT procedure and report rather than treating a photograph of equipment as inspection evidence.

For example, SAE AMS2631 addresses ultrasonic inspection of wrought titanium products within its defined scope. Its public description includes a thickness or diameter threshold, so it should not be applied automatically to every thin sheet order. Confirm the specified revision, product scope and acceptance requirements with the inspection provider; a public summary does not supply the full procedure.

Put the review questions into the RFQ

Send the material and examination requirements together so suppliers can assess the same scope:

  • Grade, material specification and revision, condition, thickness, width, length and quantity.
  • Delivery form: parent plate or identified cut blanks, with the relevant drawing and inspection stage.
  • Required UT specification and revision, acceptance class or criteria, and any project-approved procedure.
  • Required coverage, treatment of limited-access areas, reporting, traceability and any witness or review points.

Resolve an incomplete report before release

Compare the delivered item and report against the agreed order. If the piece identity, coverage or acceptance basis is unclear, request a corrected report or the missing supporting records. Do not silently reinterpret a different class as equivalent or assume that retesting is unnecessary. The responsible quality or engineering authority should resolve the discrepancy before material acceptance.

Examination scope and documentation must be confirmed in the quotation; this guide is not a statement that every plate is supplied with the same UT package.

Technical references

SAE AMS2631G public scope · Evident calibration concepts · Evident transducer selection. Follow the specification and revision required by the actual order.

Review UT reporting requirements for your titanium plate order.